9.1.1 Mining and metallurgical property, plant and equipment– major fixed assets under construction
in PLN millions, unless otherwise stated
As at 31 December 2022 |
As at 31 December 2021 |
|
Deposit Access Program | 3 318 | 2 796 |
Construction of the SW-4 shaft | 589 | 565 |
Investment activity related to the development and operation of the Żelazny Most Tailings Storage Facility | 280 | 424 |
Damówka pumping station with a backwater pipeline in the Tailings Division | 145 | 131 |
BAT As – Installation for arsenic and mercury removal from gases before Solinox installation | 117 | 113 |
Modernisation of the tankhouse at Głogów I Copper Smelter and Refinery – reconstruction of the roof and walls of the tankhouse | 96 | 89 |