Integrated Report
2022

Investments

KGHM Polska Miedź S.A.

In 2022, capital expenditures on property, plant and equipment amounted to PLN 2,868 million. Together with expenditures incurred on uncompleted development work, capital expenditures stood at PLN 2,877 million and were greater than in the previous year by 11.3%.

Structure of expenditures on property, plant and equipment and intangible assets of KGHM Polska Miedź S.A. (in million PLN)
2022 2021 Change (%) Q4 22 Q3 22 Q2 22 Q1 22
Mining 2,116 1,747 +21.1 801 511 420 384
Metallurgy 621 664 (6.5) 218 142 177 84
Other activities 57 91 (37.4) 18 23 11 5
Development work – in progress 9 7 +28.6 2 2 1 4
Leases per IFRS 16 74 77 (3.9) 10 21 34 9
Total 2,877 2,586 +11.3 1,049 699 643 486
including borrowing costs 182 119 +52.9 59 52 25 46

CAPEX execution in 2022

* excl. Leasing per IFRS 16

Projects related to the replacement of equipment aimed at maintaining production equipment in an undeteriorated condition, represent 43% of total expenditures incurred.

Projects related to maintaining mine production aimed at maintaining mine production on the level set in approved Production Plan (development of infrastructure to match mine advancement) represent 32% of total expenditures incurred.

Development projects aimed at increasing production volume of the core business, implementation of technical and technological activities optimising use of existing infrastructure, maintaining production costs and adaptation of the company’s operations to changes in standards, laws and regulations (confirmatory projects and those related to environmental protection) represent 23% of total expenditures incurred.

Adaptation projects aimed at adapting the company’s operations to changes in laws, existing standards or other regulations, especially as regards occupational health and safety, securing property, cybersecurity, ethical and anti-corruption standards, environmental impact, quality standards and management systems, represent 2% of expenditures incurred.

KGHM INTERNATIONAL LTD.

2022 2021 Change (%) Q4 22 Q3 22 Q2 22 Q1 22
Victoria Project 49 38 +28.9 12 12 15 10
Removal of superlayer and other 155 224 (30.8) 22 42 38 53
Total 204 262 (22.1) 34 54 53 63
2022 2021 Change (%) Q4 22 Q3 22 Q2 22 Q1 22
Victoria Project 221 147 +50.3 57 57 63 44
Removal of superlayer and other 692 867 (20.2) 103 202 168 219
Total 913 1,014 (10.0) 160 259 231 263

Capital expenditures of the KGHM INTERNATIONAL LTD. segment in 2022 amounted to USD 204 million, which represents a decrease by USD 58 million (-22%), compared to 2021. Expenditures on the Victoria project increased, while the decrease in other expenditures resulted chiefly from lower spending on the preparation of the deposit for future operations by the Robinson mine.

Sierra Gorda S.C.M.

n 2022, expenditures on property, plant and equipment, and intangible assets, included in the cash flow statement of Sierra Gorda S.C.M., amounted to USD 420 million, the majority of which, i.e. USD 166 million (40%) was expenditure on removal of the superlayer to access further parts of the deposit, and the remaining amount was incurred on development and replacement of property, plant and equipment.

Capital expenditure on Sierra Gorda S.C.M.
J.m. 2022 2021 Change (%) Q4 22 Q3 22 Q2 22 Q1 22
Expenditure on property, plant and equipment mln USD 420 284 +47,9 119 78 74 149
Expenditure on property, plant and equipment – segment (55% share) mln PLN 1 031 605 +70,4 296 211 182 342

The 48% increase in expenditures compared to 2021 was primarily due to the acquisition of the Oxide project from KGHM INTERNATIONAL LTD. in 2022.